October  2003  Progress

With this layout featuring a dual-gauge, Main Line loop, it seems

we should see some of the current locomotives from both gauges.

Plus, the dual gauge, balloon-loop at the end of the Durango Yard

is now completed. This loop will be in a tunnel, under the Spring area.

<Back>   to the pictures page

SB0310a.jpg

On3 engine #461,

an RGS 2-8-2 K-27

SB0310b.jpg

Locomotive #1164,

a Std Gauge 2-8-0

SB0310c.jpg

a D&SL  Mallet,

a nice 2-6-6-0

SB0310d.jpg

Cars in a Std Gauge

train and dual tracks

SB0310e.jpg

A NG train and

Durango facilities

SB0310f.jpg

Durango Station,

in mock-up for size

SB0310g.jpg

The Durango Yard

with loop/wye at end

SB0310h.jpg

A view showing the

Balloon Loop / Wye

SB0310i.jpg

3 levels of track as

you come up stairs

SB0310j.jpg

Dual Ga main and

two storage leads

SB0310k.jpg

EasyDCC panel and

a temp track panel

SB0310l.jpg

The garage below,

train room above

 

This page was created on 8/3/04.