Benchwork  &  Track Starts  -  2002

These pictures from Craig, show the solid under-frame, benchwork in some detail,

along with the start of track work in the lower, hidden storage area.

Note the system used on the wall to support the benchwork, and the very solid

2x4 construction ‘walls’ where the later bench-system will be mounted.

< Back >  to the pictures page…

SDJuly02a.jpg

coming up the stairs

SDJuly02b.jpg

the wall brackets

SDJuly02c.jpg

covered windows

SDJuly02d.jpg

the main aisle way

SDJuly02e.jpg

center of the room

SDJuly02f.jpg

solid center supports

SDJuly02g.jpg

Durango yard area

SDJuly02h.jpg

Durango again

SDSept02a.jpg

Alamosa storage

SDSept02b.jpg

storage balloon loop

SDSept02c.jpg

all this will be hidden

SDSept02d.jpg

staging / storage yard

 

Page created on  2/8/04