August saw lots of work done on
the railroad. The lower level completed,
the Los Pinos Yard level plywood
goes in over Alamosa, and the grade uphill
present the need for a lift
section, that will carry both the uphill track to mid,
plus the future mid-level ‘loop’
track. So two tracks over one lift
section.
<
Back > to the MMRR picture list
Page created 8/30/07