August 2007 - Benchwork

August saw lots of work done on the railroad.  The lower level completed,

the Los Pinos Yard level plywood goes in over Alamosa, and the grade uphill

present the need for a lift section, that will carry both the uphill track to mid,

plus the future mid-level ‘loop’ track.  So two tracks over one lift section.

 

MMmidlevel0807a.jpg

MMmidlevel0807b.jpg

MMmidlevel0807c.jpg

MMmidlevel0824a.jpg

MMmidlevel0824b.jpg

MMmidlevel0824c.jpg

MMmidlevel0824d.jpg

MMmidlevel0824e.jpg

 

< Back >   to the MMRR picture list                         < Return >   to the Equipment page

                  Page created  8/30/07