Track work is finished for most of the
lower level and Tortoise turnout motors are installed.
Next comes the fun of wiring the sidings,
spurs and turnouts, with some power routing planned.
Last two photos show the grade area under
Note the 2nd picture
in each row: the lower level staging and
planned mid-level Yard and Wye area
that will sit above it.
<
Back > to the MMRR picture list Page created 7/28/07