Alamosa  Staging  Yard

Track work is finished for most of the lower level and Tortoise turnout motors are installed.

Next comes the fun of wiring the sidings, spurs and turnouts, with some power routing planned.

Last two photos show the grade area under Lumberton, from staging up to the mid-level.

Note the 2nd picture in each row:  the lower level staging and planned mid-level Yard and Wye area that will sit above it.

 

MMAlamosa_0607a.jpg

MMAlamosa_0607b.jpg

MMAlamosa_0707a.jpg

MMAlamosa_0707b.jpg

MMAlamosa_0707c.jpg

MMAlamosa_0707d.jpg

MMAlamosa_0707e.jpg

MMAlamosa_0707f.jpg

 

< Back >   to the MMRR picture list                                                           Page created  7/28/07