Alamosa Staging - Track Work Starts

April of 2006, track work starts in the lower, Alamosa staging yard

This is the lower sub-level staging area, 4 loops, plus various spurs.

Cutting ties was no fun, nor was staining them in the Spring sun.

With a visit by good friend Barry Bogs, we glued down ties and spike rail.

Position some ladder switches and even installed track on the swing-bridge.

 

MM0406a.jpg

MM0406b.jpg

MM0406c.jpg

MM0406d.jpg

MM0406e.jpg

MM0406f.jpg

MM0406g.jpg

MM0406h.jpg

Track progress starts on the Alamosa staging area ! ! !

< Back >   to the MMRR picture list                                                  Page created  4/10/06