Barry Bogs' 1/22.5 scale Union Pacific Big Boy 4018 Right Side - Oct. 2nd 2021 |
The latest from the boys in the shop! I directed the boys to complete
the right hand side of the engine, below the running boards. Lots of
piping and conduit to install. With all the piping in place, the boys
then checked to make sure every thing would work while the engine was on
a curve. No problems were found, so I signed off on the work and gave
the boys the rest of the day off. Tomorrow is another day, so it was
time to call it a day and close up the shop. Stay tuned for the next
update as the tender will be mated to the engine! As always, thanks so
much for your support of the BLW projects. -
Barry |
skip to other pictures in this project series |
to the Big Boy project page | the C&W home page | Page created 10/11/2021 |