Barry Bogs' 1/22.5 scale Union Pacific Big Boy 4018 Upper Boiler - Sep. 11th 2021 |
Guys,
the boys in the shop have been putting their rear in gear and have been
cranking out the details on the boiler above the running boards. Since
the sand domes have been adjusted in height, I turned the boys loose on
getting the details done on them and the rest of the boiler. The boys in
the fabrication shop had to turn the brass pop valves with the shop
lathe, and also built the brass bell bracket. The boys in the plumbing
shop did all the conduit for the wiring from the generator to the class
lamps and number boards. When I step back and look at the engine,
it really is starting to look like a Big Boy now, but there is so much
more to do. It seems that this project will never end after a year in
the works, but I keep the boys focused and we can see the light at the
end of the tunnel. (More train talk) Well, I hope you see something of
intrest with this update. I will update you on the major steam piping
next time, but until then, keep the train on the track, and heading in
the right direction. Thanks, Barry - Chief director of
BLW, still building the trains of my dreams, even if it takes
forever...... |
skip to other pictures in this project series |
to the Big Boy project page | the C&W home page | Page created 9/14/2021 |