Barry Bogs' 1/22.5 scale Union Pacific Big Boy 4018 Pilot Pumps & Sheild - Jan 31st, 2021 |
There
has been a flurry of activity on the shop floor. The boys have been busy
with fabricating the pump shield and hanging the pumps. The pumps were cast in the molding and casting shop and hung with care by the boys in the erection shop. While the pumps were being plumbed, the other half of the crew was busy creating the shield assembly and putting all the details on it. Just like Christmas, the number plate was shined up and topped off the deck of the shield. - Barry |
skip to other pictures in this project series |
to the Big Boy project page | the C&W home page | Page created 1/31/2021 |