D&RGW T-12 Construction Progress September 1st, 2018 |
The cab and backhead of the boiler are
built. Various brass fittings on the backhead, includes piping, gauges
and values.
The cab from styrene, curved roof and various windows. There are two
figures showing the place where Crew will sit.
Click any photo to enlarge - Scroll thru them after opening one