January 29-30th, 2021

Shop Work and Plowing Snow

I moved the valves for the water crane from the roundhouse West wall by the floor to out under the edge of the upper grating where
the steps are to climb up.  The valves had to be reconfigured to work as they wouldn’t meet up with the hoses.  We had the parts in
our plumbing supply to cover the changes.  The barrel sight gage was so dirty you couldn’t tell how full they were.  I got the old one out
and tried to clean it but it couldn’t be cleaned so off to Ace to get a new hose.  I added some markings with a Sharpie so we can gauge
the water depth.

For those that don’t know, there are five 55 gallon barrels placed on racks strung along the top west wall of the roundhouse for
water storage that can be sent out to the outside water crane.  One valve allows the water to go out from the barrels and
the other valve is to drain the line so it doesn’t freeze.

The line needed plowing and switches cleaned out so I got out the plow and #25 and plowed out the line by myself.  -  Tom
 
Click any picture and scroll thru the rest.  Note the original and two variations of #25, to see examples of changes I do to prepare pictures for website use  - Frolin
SRCL_20210129a.JPG SRCL_20210129b.JPG SRCL_20210129c.JPG SRCL_20210130a.JPG SRCL_20210130b.JPG
SRCL_20210130c1.JPG SRCL_20210130c2.JPG SRCL_20210130c3.JPG SRCL_20210130d.JPG


go back to the Photo Update listing page