November 2018 |
Here are photos from four days in November,
with snow, track work and hauling wood.
Mid-month had an extra run to clear
snow and then bring in a load of firewood.
On the 22nd, two loads brought
down from the CBE branch and
delivered to Woodshill.
The next day, some older ties were replaced,
while the temperature was above freezing.
And on the 26th, the
railroad received 6
1/2 inches of snow.
Nov. 16th, plowing snow and hauling
some firewood...
Nov. 22nd, hauling firewood
with #24 and short train...
Nov. 23rd, working on the track, replacing some ties...
Nov. 26th, it snowed heavy and covered the railroad...
< click any photo to expand, then scroll through that day's
pictures >
|
go back to the Photo Update listing
page |