November  2018

Here are photos from four days in November, with snow, track work and hauling wood.
Mid-month had an extra run to clear snow and then bring in a load of firewood.
On the 22nd, two loads brought down from the CBE branch and delivered to Woodshill.
The next day, some older ties were replaced, while the temperature was above freezing.
And on the 26th, the railroad received 6 1/2 inches of snow.


Nov. 16th,  plowing snow and hauling some firewood...
SRCL_20181116a.JPG SRCL_20181116b.JPG SRCL_20181116c.JPG

Nov. 22nd,  hauling firewood with #24 and short train...
SRCL_20181122a.JPG SRCL_20181122b.JPG SRCL_20181122c.JPG SRCL_20181122d.JPG

Nov. 23rd, working on the track, replacing some ties...

SRCL_20181123a.JPG SRCL_20181123b.JPG SRCL_20181123c.JPG

Nov. 26th, it snowed heavy and covered the railroad...

SRCL_20181126a.JPG SRCL_20181126b.JPG SRCL_20181126c.JPG SRCL_20181126d.JPG

 

<  click any photo to expand,  then scroll through that day's pictures  >

go back to the Photo Update listing page