July 4-5-6  2018

On the 4th, we picked up the second and third load of wood for Woodshill for the year and stacked it.
On the 5
th, we loaded the straightened rail on the gon.  We have a new supply of creosoted ties so added them to the flat
and took them to the CBE branch where damaged by the tree falling.  We laid out the rail but found it too hot to continue.

On the 6th, we got the rail hooked up but the ties had to wait as the sun made it to warm when we lost the shade.

On the 7th, the weather was nice so we got the track back into service to the big tree back, where Jack is standing. 
-  Tom

SRCL_20180700a.jpg SRCL_20180700b.jpg SRCL_20180700c.jpg SRCL_20180700d.jpg
SRCL_20180700e.jpg SRCL_20180700f.jpg SRCL_20180700g.JPG SRCL_20180700h.JPG SRCL_20180700i.JPG

go back to the Photo Update listing page