August 9th  2017

We were out working in the heat! This day we were out working on the bridge just below Casper Cut.
The ties on the bridge were failing and the top level bulkhead ties were going also.  Some pics of us working
on the replacement.
  A note: the bridge ties were spiked to the bulkhead tie so I cut them out with a recip saw and
then had to grind down the stubs.  Jack shows off the old bulkhead ties and yells “hurry up, as ants heading up arm”!
A shot of the train going back to the barn and tying up for the day from the cab window.   - Tom
SRCL_20170818a.JPG SRCL_20170818b.JPG SRCL_20170818c.JPG SRCL_20170818d.JPG SRCL_20170818e.JPG
SRCL_20170818f.JPG SRCL_20170818g.JPG SRCL_20170818h.JPG SRCL_20170818i.JPG SRCL_20170818j.JPG
 

 
Photo Captions via Tom,  in order seen above...
-  Tom grinding on nail stubs
Tom grinding on nail stubs (2)
Tom grinding on nail stubs (3)
Jack inspecting the destruction of upper level
-  New upper level put in
-  New upper level put in (2)
-  Jack showing rotted tie
-  Work Train at bridge site
-  Work Train at bridge site (2)

  go back to the Photo Update listing page